Works are progressing well on site with the perimeter piling works and capping beam completed. The site dewatering system has been installed and currently being commissioned. The footing for the tower crane has been completed and the site has been cleared for commencement of excavation works. The excavation works to the entire site are to be completed before end of month and once completed the inground services and pits under basement 2 will be installed. Basement 2 slab is on track to be formed up and poured by mid to late September.