Sur Kirra Beach – Build Update
All under slab waterproofing to the underside of basement 2 has been completed, with lift pit and tank bases poured and walls formed. More than 100 tonne of reinforcing steel has gone into the basement two slab and the tower crane footings have now been installed on site in preparation